From: route@monster.com
Sent: Thursday, April 07, 2016 11:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
RESUME Zhao Wang Current Working Location:
Sharjah, UAE Permanent Residency: La Verne, CA
91750 Tel.: 909 593 6085 (Home) and 309
287 0813 (Cell) Email: wang_zhao@hotmail.com EDUCATION: MS, Construction Engineering Management, Oregon State University,
Corvallis, OR USA 1999 BS, Mechanical Engineering, Wuhan University of Hydraulic and Electrical
Engineering, Wuhan, P. R. China, 1984 EXPERIENCE: Total twenty-seven years of professional experiences in project controls
/ project management / Engineering /Construction for different projects. AMEC Foster Wheeler, Sharjah, UAE, 10/2014 to Present Lead Planning Engineer Planning group Lead of PMC, MAB1 of KNPC
Clean Fuel Project, EPC Phase, EPC Contract value at US$3.6 billion.
Supervision of all planning/scheduling/progress measurement responsibilities
of EPC Contractor of JV between Petrofac, Samsung, and CBI. WorleyParsons Houston, TX, 02/2014 to 09/2014. Monrovia, CA, 08/2010 to 01/2014 Chief Project Controls Specialist Responsible for all scheduling/progress measurement responsibilities of
assigned projects/programs required by procedures of WorleyParsons and
clients. Major
Projects: Marathon GBR & TRD Portfolio Projects, Houston, TX, EPC Program Scheduler BP Alaska, Arctic AFG Program, FS2 FGR (Fire & Gas Revamp) Project,
EPC, $120 million. Lead Scheduler SORESCO Moin Refinery Expansion and Modernization Project, FEED, $1.5
billion, Limon, Costa Rica - Expanding capacity from 25,000 to 60,000 BPD and
existing units revamp. Lead Scheduler of IPMT (Integrated Project Management Team) Lead Scheduler of Revamp Units (ADU/VDU/GCU/KHT) SAMREF Clean Fuel Project, EPC, $1.7 billion, Yanbu, Saudi Arabia – New
units/Revamping existing units, and utility / DCS upgrading, 400,000 BPD
refinery to meet 10 ppm sulfur requirements of gasoline and diesel. Lead Scheduler of NHT (Revamp) Unit Technip USA, Inc., Claremont, CA, 05/2006 to
11/2009 Principal
Scheduler, Project Controls Responsible for all scheduling/progress measurement responsibilities of
projects assigned, required by procedures of Technip and clients. Major
Projects: (Lead scheduler role at each) Suncor MNU Hydrogen Plant, EPC,
40MMSCFD, Canada Chevron Nox Reduction Facility,
EP, El Segundo, CA, USA BP Hydrogen Plant, EDS, 40MMSCFD,
Cherry Point, WA, USA Sinclair Hydrogen Plant, EP,
82MMSCFD, Tulsa, OK, USA Power Holding Coal-to-Natural Gas
Plant, Cost Validation, $3 billion, Waltonville, IL, USA. Petrobras Hydrogen Plant, PDP,
2x110MMSCFD, Brazil GS Caltex HOU 3 Hydrogen Plant,
EP, 110MMSCFD, South Korea Cenex Harvest State Hydrogen
Plant Expansion, EP, 4MMSCFD, Laurie, MT, USA CR Fuels Bio Fuels
Project(ethanol, biodiesel, co-gen), FEED, $270 million, Canada Reinicke Construction, Fairfax, SC, 03/2006 to
04/2006 Scheduler Responsible for developing a baseline schedule loaded with resources for
scope of work of Oriented Stranded Board Plant in Fairfax, SC. A $230 million
capital project of Grant Forest Products. PM Solutions, Bloomington, IL, 10/2004 to
02/2006 Consultant – Project Planning and Scheduling As a consultant, provided project management services to State Farm
Insurance, developed, maintained, updated resource loaded IT project
schedules, planned and allocated resources, created progress reports, Earned
Value analysis, and dashboard documentation. Fagen, Inc., Granite Falls, MN 11/2000 to
10/2004 Corporate Scheduler/Cost Engineer Generally, under COO, in charge of company scheduling operations and
focusing on major projects through whole project delivery process with
project types of design/build, general contractors, and T&M. Project List: ·
100
mgy Dry Mill Ethanol Plant - $70 million general construction contract. - Verusun
Ethanol Plant, Aurora, SD, USA. ·
40
mgy Dry Mill Ethanol Plants – $45 - 50 million design/build contract of each,
generally. - Glacial
Lakes Ethanol Plant, Watertown, SD, USA. - MGP
Ethanol Plant, Lakota, IA, USA. - Little
Sioux Ethanol Plant, Marcus, IA, USA. - KAAPA
Ethanol Plant, Minden, NE, USA. - Platt
Valley Ethanol Plant, Central City, NE, USA. - MWR
Ethanol Plant, Iowa Falls, IA, USA. - Mid
Missouri Renewable Ethanol Plant, Malta Bend, MO, USA. - UWGP
Ethanol Plant, Cambria, WI, USA. - Golden
Grain Energy Ethanol Plant, Mason City, IA, USA. ·
20
-25 mgy Ethanol Plants - US
Energy Ethanol Plant. Russell, KS, USA. - Husker
Ag Ethanol Plant, Plainview, NE, USA. - Commonwealth
Ethanol Plant, Hopkinsville, KY. ·
Power
Plants - Ray
Olinger Power Plant, Nevada, TX, 76 mw. - Wolf
Hills Power Plant, Bristol, VA, 250 mw. - Chanute,
KS Power Plant. ·
Wastewater
Treatment Plant – - Waterloo,
IA Wastewater Treatment Plant expansion. ·
Proposals
and outage project schedules - Numerous
ethanol plants, chemical plants, thermal/wind power plants, and
water/wastewater projects. Thor Construction Inc., Minneapolis, MN,
09/2000 to 10/2000 Project Scheduler/Cost engineer Responsible for updating and
Maintaining project master schedule and cost reporting. Minneapolis Convention Center Expansion. $170
million CM contract. Changchun Water Supply and Environmental
Project Management Office (CWSEPMO), Changchun, P. R. China, 02/1994 to
12/1997 Manager
of Project Controls Construction
Manager of Wastewater Section Supervised project controls
activities including schedule, cost, quality, documentation, and change
orders. Coordinating consultation affairs served by CH2M HILL. Involved in
biding/procurement and contract management. In charge of construction
management documentation submitted to the World Bank. Major interpreting and
translating tasks for the World Bank officials and CH2M HILL consultants
between English and Chinese. Changchun Water Supply and Environmental Project (CWSEP) - A World Bank
funded capital project, at US$250 million budgetary size. The project
included a 60 mgd water treatment plant, a 103 mgd wastewater treatment
plant, sixty miles of water conveyance pipelines with six feet diameter,
eighty meter water head pressure, six intake/booster pump stations, a five
mile tunnel with nine by nine feet section, forty miles of distribution main,
interceptor sewer, and matched power/SCADA system. Northeast Exploration & Design Institute
of China National Water Conservancy Ministry, Changchun, P. R. China, 08/1984
to 02/1994 Engineer Mechanical Equipment engineering and design, steel and concrete
structural engineering & design. Construction facility layouts.
Engineer’s project concept schedules. Concrete mixing plant design. Concrete
aggregate planning and processing plant design. Involved in more than two dozens of mid-large size hydro power projects
up to 150-meter high concrete dam, 1,500mw power house. COMPUTER
SKILLS
Lotus Notes.
MS Outlook,
MS Office (Excel, PowerPoint, Word), MS Project. Primavera
Suretrak, P3, P3E, P6, Expedition. Cognos. Progress
Measurement software of Technip and Worleyparsons.
Other
softwares. 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
Chinese - Mandarin |
Fluent |
|
|
English |
Fluent |
|
|
|